Earth Systems Group of Companies. Click here to go to the Home page.
  Search function
Earth Systems Group of Companies. Click here to go to the Home page. Engineering geology, environmental consulting, materials testing
top bar
    

Allan Hancock College
Antelope Valley College Expansion
Antioch Magnet High School
Arroyo Grande High School
Atherwood Elementary School
Cal Poly Sports Complex
Copper Mountain College
Dorothea Lange Elementary School
Estrellita High School
Gavilan College
Inyo County Community School
Larkspur Schools Modernizations
Nipomo High School
Oakley Prewett Ranch School
Oxnard High School
Poly Canyon Village
Reed Schools Modernization
Santa Rita Elementary School
Tierra Linda Elementary School

top bar

 

Court Street
All Projects

 
 

Engineers without Borders
Our Newsletter

 
 


Contact Us

 

 

 

 

Dorothea Lange Elementary School
Nipomo, California

The new elementary school is located on a 15-acre parcel east of Via Alta Mesa Road in Nipomo.The project consisted of the construction of classrooms, an administration building, a multi-purpose building, a kindergarten area, restrooms, relocatable buildings, grass playing fields, hardcourts, and parking areas.  Construction type is single-story, wood-frame, with conventional foundations and concrete slabs-on-grade. 

Earth Systems Pacific has provided extensive professional services for the project.  Initially, we conducted a Phase I environmental site assessment to evaluate areas of potential environmental concern.  Aerial photographs, oil and gas maps, Federal and State environmental databases including the U.S. EPA Toxic Release Inventory System database were researched. Samples from near-surface soils were collected and analyzed for residual levels of agricultural chemicals. 

A soils engineering investigation and a geologic/seismic study were then conducted. We provided geotechnical recommendations for site preparation, grading, utility trenches, foundations, slabs-on-grade, retaining walls, pavement sections, and site drainage.  The geologic characteristics of the site, seismicity, and primary and secondary earthquake effects were addressed. 

Because of the site’s past usage for agricultural purposes, we were later retained to perform a preliminary endangerment assessment during which borings were drilled and soil samples from the borings were analyzed for compounds such as lead, arsenic, mercury, organochlorine pesticides and organophosphate pesticides.  The results of the assessment indicated that the site did not pose a hazard to public health or the environment and the project went into construction. 

During construction our technicians and inspectors performed grading observation and testing, foundation excavation observation, laboratory testing, and special inspection of construction materials. Construction of the school was completed in 2006.

 
     
                                                Site Map     Refer-a-Friend     Save In Favorites     Print Page    
bottom bar
© 2010 Earth Systems group of companies. Contact us
elements CMS Web Content Management System
Designed by NIT