Earth Systems Group of Companies. Click here to go to the Home page.
  Search function
Earth Systems Group of Companies. Click here to go to the Home page. View our comprehensive services: geotechnical engineering, engineering geology, hyrogeologic studies, geophysical surveys, environmental assessments and remediation, construction materials testing and inspection, materials laboratory testing.
MainNav
top bar
    

Allan Hancock College
Antelope Valley College Expansion
Antioch Magnet High School
Arroyo Grande High School
Atherwood Elementary School
Cal Poly Sports Complex
Copper Mountain College
Dorothea Lange Elementary School
Estrellita High School
Gavilan College
Inyo County Community School
Larkspur Schools Modernizations
Nipomo High School
Oakley Prewett Ranch School
Oxnard High School
Poly Canyon Village
Reed Schools Modernization
Santa Rita Elementary School
Tierra Linda Elementary School

top bar

 

Hwy 101
All Projects

 
 

Subsidence
Our Newsletter

 
 

Click here for worldwide earthquake data from USGS

USGS Worldwide
Earthquake Data

 

 

 

Nipomo High School
Thompson Avenue, Nipomo, California

The Nipomo High School is constructed on an 80-acre site in Nipomo.  The project comprised the phased construction of approximately 80 buildings including administrative support, media/library, lecture forum, multi-use, science, industrial technology, fine arts, music, drama, gymnasium, technical control, covered lunch area, relocatable classrooms, and maintenance buildings.  Grass playing fields, hardcourts, a swimming pool, and parking lots were also be constructed.  Most of the permanent buildings are of wood or steel-stud construction; the multi-use building and the gymnasium is of masonry construction. 

Our personnel were retained to provide peer review of previous geotechnical and environmental studies of the site.  As a result of this review, it was determined that a more economical means for grading the site and founding the structures might be possible.  To verify this conclusion, a soils engineering investigation entailing site reconnaissance, subsurface exploration, laboratory testing, and geotechnical analysis of resulting data was performed.  Cone penetrometer data were analyzed to determine the potential for liquefaction at the site.  Additionally, a geologic hazards study was conducted by our personnel.  This study included the evaluation of geologic characteristics such as groundwater, faulting, slope stability, and flooding.  Potential seismic hazards such as ground shaking and surface ground rupture were assessed as well.  The cone penetrometer data were also analyzed to determine if a trace of the Wilmar Avenue fault crosses the building area. Our personnel concluded as a result of these investigations that the more economical means of construction using conventional foundations with slabs-on-grade may be utilized. 

We were also retained to perform a preliminary endangerment assessment (PEA) for which borings were drilled and soil samples from the borings were analyzed for chlorinated herbicides, selected metals, and petroleum hydrocarbons.  The results of the PEA indicated that the site does not pose a hazard to public health or the environment.  The PEA was approved by the California Department of Toxic Substances Control, and the high school entered the construction phase in December of 2000, during which we provided construction observation and testing, and special inspection of concrete, masonry, and steel.

 
 
     